Contact Us
Global Technical Service Co. Ltd
Contact: manager Chen
Tel:0769-8805 6552
Fax:0769-8805 6550
Phone:13360489203
QQ:417901602 
E-mail:info@globalgd.com / global_amy@126.COM
Address: Guancheng District, Dongguan City Wan Tai Road No. 5 XM Building, Room 507

Global Technical Service Co. Ltd
OFFICE Room 2103,21/F Ho King Commercial Centre, No. 2-16 Fa Yuen Street, Mong kok, Kowloon,HK
Tel: 00852-30697929
FAX:00852-6991 7688

The VDE Factory review and consistency management procedures --saa certificationVDE
 
Relevant document
CIG021: Factory review process –to uniform provisions that this file contains all production plants review procedures and tests. The purpose is to ensure that all certified products are in line with acceptable factory production processes.
Appendix:
Routine test A
Product inspection test B
 
CIG022:Factory inspection report before the certificate
A part: Completed by the certification body of the request for review.
B part: The factory can be carried out for the factory to review after complete this form. This form should be filled out in detail, especially involving the b.6.2 and b.6.1 shall indicate to check and inspection of the sample rate and the test parameters range.
 
CIG023:The Report of Factory Review
This report is to be filled out by the examiner in the test or routine test before issuing the certificate. The inspector shall refer to the contents of the CIG 022 section B, and compare it with the actual conditions of the factory, then complete the report.
The purpose of the complete the report during the routine is to ensure that the testing and quality management procedures are meet the relevant standards in the CCA system certification.
ENEC CIG023 appendix
Use this appendix in the following situations:
Factory production of ENEC products, which needs the quality system, but the factory has not a certification authority of accredited quality system.
 
CIG024:Factory review
The standard requirements for routine inspection and product validation testing are described in PM's VDE form. For each product category in a specific version standard, that should be created the separate forms as the basis for authentication.
 
The VDE review process has always been included the current certificate corresponding with the "PM" content.
 
In the pre certification period, the inspector will give the "PM table" to the manufacturer.