- Sitemap - Chinese - English

Contact Us
Contact:Mr.Chen
Tel:0769-8805 6552
Fax:0769-8805 6550
Phone:13360489203
E-mail:info@globalgd.com / global_amy@126.COM
Q  Q:417901602
Address:Guancheng District, Dongguan City Wan Tai Road No. 5 XM Building, Room 507

Global Technical Service Co. Ltd
OFFICE Room 2103,21/F Ho King Commercial Centre, No. 2-16 Fa Yuen Street, Mong kok, Kowloon,HK
Tel:00852-30697929  
FAX:00852-6991 7688

Germany / VDE plant review and conformance management procedures

VDE Factory Audit and Conformance Program --saa certification
 
Related files
 
CIG021: Plant Review Procedures - Uniform Regulations This document contains typical plant review procedures and tests that should be provided and performed by all manufacturing plants. The aim is to ensure that all certified products comply with acceptable factory production processes.
 
Appendix:
 
Routine testing
 
Product Inspection Test B
 
CIG022: Factory audit report before certification  
Part A: To be completed by the certification body requesting the review.
Part B: Factories must complete this form before they can conduct a pre-certification factory audit. The form shall be completed in detail, in particular with regard to sections b.6.1 and b.6.2, indicating the sample rate for inspection and testing and the range of test parameters.
 
CIG023: Factory Inspection Report
 
This report is completed by the examiner during the examination or routine examination before issuing the certificate. The inspector should refer to the contents of CIG 022B and compare it with the actual situation of the factory before completing the report.
 
The purpose of completing this report during the regular inspection is to ensure that the inspection and quality management procedures continue to meet the relevant standards during the period when the CCA system certification is in force.
 
CIG023 ENEC Appendix
 
Use this appendix when:
The factory requires a quality system to produce ENEC products. The factory does not have an accredited quality system certification body
 
CIG024: Factory Review
 
The standard requirements for performing routine inspections and product validation tests are described in the VDE's PM form. For each product category mentioned in a particular version of the standard, a separate form should be created as the base document for certification.
 
The VDE's review procedure always contains the &rdquo corresponding to the current certificate; PM table ” The CONTENT.
 
During the factory audit before issuing the certificate, the examiners generally will "; PM table "; Give it to the manufacturer.