The report introduction of CSA certification factory inspection
 
The Factory Audit Report is a legal document signed by the CSA inspector when performing factory inspection, to record the status of the CSA certification products produced by the factory and to confirm whether the safety features of the CSA products in the actual production meet the requirements of the CSA standards. The report is usually in three copies, the green page is CSA reserved; the red page is reserved for the factory; the yellow page is reserved by the CSA inspection center.
 
The FAR style of factory inspection report and the specific items are as follows:
Project A: Records factory codes, certification master contract number and factory contract number.
Project B:  the name of the applicant
Project C: the applicant's address is certified.
Project D: the name of the factory
Project E: address of the factory.
Project F: frequency: records the frequency of factory inspection, that is, the number of factory inspections per year, usually 2 or 4 times.
Code G: represent of this test for telephone access test.
Project G: the details of the products to be examined at this inspection, usually are the product name, model, electrical and related parameters and serial numbers, etc.
Project H: record the structure and material of the inspected product in compliance with the certification report; does the factory know the latest technical notices of CSA (such as: CSA, Certification, Notices, Informs, or, Bulletins) and their effective date?
Project I: records the actual process of factory inspection, including: inspection of factory production area, confirmation of factory test, product inspection, sampling of samples, on-site service and standards, interpretation of certification reports and so on.
If the products tested are in compliance with the requirements of the certification report, the inspection results shall be recorded as satisfactory. If the product is found to be out of conformity with the certification report (e.g.: changes in product structure and dimensions, replacement of parts, identification of signs, etc.), will be itemized detailed records found product change status, and specify whether or not to accept the change status.
File number: Record the certification number and item number of the certification items belonging to the inspected product.
Code: To record the code corresponding to the inspection result of this plant for internal statistical archiving of CSA.
Project J: if the certification reports are requires doing the performs routine plant safety testing, so the actual test content of the factory is recorded in this item, Including: test items, test specific parameters, test execution ratio and calibration period of test instruments.
Project K: Determine whether the product being tested conforms to current standards and notices or not.
Project L: list the standards used in this inspection, Notices, Bulletins, and other relevant requirements.
Project M: The records of the finished products and the records of parts sampling. If a sample of the product concerned is requested to be sent to Canada for CSA re test, there will an additional details of the items and quantities of the sample and be attached to the attached form.
Project N: records of product identity. Determine whether the safety label on the product concerned conforms to the requirements of the certification report.
Project O: To record the actual content of the product identification and record its identification method.
Project P: If the product is found to be out of conformity with the certification report, so it is used to record non conformity items and corrective actions, and instruct the factory to improve its products, to meet the requirements of the certification report.
Project Q:Records the number of the factory retention for the CSA tags and the corresponding serial numbers. (applies only suitable for products that require CSA tags)
Project R: To record if the nonconformity found in the previous factory inspection has been corrected; and are records of the tested products removed from the CSA certification mark?
Project S: The CSA representatives and manufacturer's representatives of both parties (including signature), to approve the contents of this report.